QA management compliance of contractors for highway and bridge projects during the 2017-2022 build build build program in Ilocos Norte district II / (Record no. 23427)

MARC details
000 -LEADER
fixed length control field 02241nam a22001817a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240830093009.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240830b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency MMSU
Transcribing agency ULS
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name De Jesus, Angel Christian E...et.al.
245 ## - TITLE STATEMENT
Title QA management compliance of contractors for highway and bridge projects during the 2017-2022 build build build program in Ilocos Norte district II /
Statement of responsibility, etc. Angel Christian E. De Jesus, Patricia Angeli F. Flojo, Darel Kieth R. Manglal-lan, Shiela Mae B. Salisi
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. City of Batac :
Name of publisher, distributor, etc. MMSU,
Date of publication, distribution, etc. 2024.
300 ## - PHYSICAL DESCRIPTION
Extent xix, 95 leaves :
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note UTHESIS (Bachelor of Science in Civil Engineering)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography: leaves 59-60
520 ## - SUMMARY, ETC.
Summary, etc. The study aimed to evaluate the quality assurance processes for highway and <br/>bridge projects in Ilocos Norte 2nd District from 2017-2022, focusing on compliance <br/>and identifying problems encountered by contractors. The research used a descriptive <br/>research design, with respondents being PCAB-licensed companies and Project <br/>Engineers of the DPWH. The data was analyzed using thematic analysis and frequency <br/>counts and percentages.<br/>The results showed that not all contractors complied with the DPWH standard <br/>specification processes, with materials, supervision, and communication being the most <br/>non-compliant classifications. Despite high compliance, contractors still encountered <br/>problems during project implementation. The study suggests that issues may not solely <br/>be related to quality assurance management but may also stem from other factors like <br/>regulatory, legal, or compliance issues. Common problems encountered during project <br/>implementation included material defects, delivery delays, and non-compliance with <br/>Personal Protective Equipment (PPE) usage. <br/>The study recommends that construction companies in Ilocos Norte adopt ISO <br/>9001-based solutions to address project implementation problems. Future researchers <br/>should consider a wider scope for more accurate data and perspectives, examine the <br/>potential applications of the QA Management Guide, and investigate the impact of <br/>advanced technologies on quality assurance management in construction projects.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Thesis/Dissertation
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Inventory number Total Checkouts Barcode Date last seen Price effective from Koha item type Public note
          MMSU Main Library MMSU Main Library Theses and Dissertation Section 08/30/2024 6882   UTHESIS-6882 08/30/2024 08/30/2024 Thesis/Dissertation Room Use Only

© 2023 Mariano Marcos State University. All Rights Reserved.

Powered by Koha