Evaluation of a five blades horizontal axis wind turbine for recharging fisherman's light at Barangay Abaca, Bangui, Ilocos Norte / Ruel Ryan C. Agustin, Nathaniel A. Ellary, Kerwyn Lloyd T. Miguel, Jonalyn S. Taclan

By: Agustin, Ruel Ryan C...et.alMaterial type: TextTextPublication details: City of Batac : MMSU, 2024Description: xvi, 61 leaves : 28 cmSummary: A study on the evaluation of a five blades horizontal axis wind turbine for recharging fisherman’s light was conducted at Barangay Abaca, Bangui, Ilocos Norte, from April to May 2024. The study aimed to analyze the performance of wind turbines in generating renewable energy and focuses on the evaluation of a wind generator, its performance, determine the cost, and also measuring various parameters crucial for assessing the performance and effectiveness of wind turbines. The generator was a five blades wind turbine, and the chosen location for this wind turbine project is at Barangay Abaca, Bangui, Ilocos Norte. The study was conducted at the place where evaluation was performed. After deployed, final data was gathered. The gathered data were presented and answered the objectives of this study.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Home library Shelving location Call number Status Notes Date due Barcode
Thesis/Dissertation MMSU Main Library
Theses and Dissertation Section Available Room Use Only UTHESIS-6913

(Bachelor of Science in Electrical Engineering)

Bibliography: leaves 48-49

A study on the evaluation of a five blades horizontal axis wind turbine for recharging fisherman’s light was conducted at Barangay Abaca, Bangui, Ilocos Norte, from April to May 2024. The study aimed to analyze the performance of wind turbines in generating renewable energy and focuses on the evaluation of a wind generator, its performance, determine the cost, and also measuring various parameters crucial for assessing the performance and effectiveness of wind turbines. The generator was a five blades wind turbine, and the chosen location for this wind turbine project is at Barangay Abaca, Bangui, Ilocos Norte. The study was conducted at the place where evaluation was performed. After deployed, final data was gathered. The gathered data were presented and answered the objectives of this study.

There are no comments on this title.

to post a comment.

© 2023 Mariano Marcos State University. All Rights Reserved.

Powered by Koha