000 | 02241nam a22001817a 4500 | ||
---|---|---|---|
003 | OSt | ||
005 | 20240830093009.0 | ||
008 | 240830b |||||||| |||| 00| 0 eng d | ||
040 |
_aMMSU _cULS |
||
100 | _aDe Jesus, Angel Christian E...et.al. | ||
245 |
_aQA management compliance of contractors for highway and bridge projects during the 2017-2022 build build build program in Ilocos Norte district II / _cAngel Christian E. De Jesus, Patricia Angeli F. Flojo, Darel Kieth R. Manglal-lan, Shiela Mae B. Salisi |
||
260 |
_aCity of Batac : _bMMSU, _c2024. |
||
300 |
_axix, 95 leaves : _c28 cm. |
||
500 | _aUTHESIS (Bachelor of Science in Civil Engineering) | ||
504 | _aBibliography: leaves 59-60 | ||
520 | _aThe study aimed to evaluate the quality assurance processes for highway and bridge projects in Ilocos Norte 2nd District from 2017-2022, focusing on compliance and identifying problems encountered by contractors. The research used a descriptive research design, with respondents being PCAB-licensed companies and Project Engineers of the DPWH. The data was analyzed using thematic analysis and frequency counts and percentages. The results showed that not all contractors complied with the DPWH standard specification processes, with materials, supervision, and communication being the most non-compliant classifications. Despite high compliance, contractors still encountered problems during project implementation. The study suggests that issues may not solely be related to quality assurance management but may also stem from other factors like regulatory, legal, or compliance issues. Common problems encountered during project implementation included material defects, delivery delays, and non-compliance with Personal Protective Equipment (PPE) usage. The study recommends that construction companies in Ilocos Norte adopt ISO 9001-based solutions to address project implementation problems. Future researchers should consider a wider scope for more accurate data and perspectives, examine the potential applications of the QA Management Guide, and investigate the impact of advanced technologies on quality assurance management in construction projects. | ||
942 |
_2lcc _cTHEDIS |
||
999 |
_c23427 _d23427 |